Logo

 

  Type Your Question In The Box Below ↓

 

Entertainment

Health

Home Remedies

News Papers 

  

General Knowledge

Our Youtube

Railway Employee

Railway

Mutual  Transfer

Railway

Question Bank

Railway

Departmental Exam 

Rail Employee 

YouTube  

Railway News 

Railway

Rules & Books

Railway

Circulars & Order

Retirment

& Pension

Railway

Manuals & Codes 

Railway

Study Material

Railway

Telephone Directory

 

 

 RAILWAY QUESTION BANK -OPERATING

(GENERAL AND SUBSIDIARY RULES)

&

Study Material

 

 

Operating Dept Exams - Study Material & Question Bank

 

( AOM, Station master, Guard, TNC, Shunting Master etc)

 

CLICK HERE

 

Question Bank - ASM Selection

                                

 

Question Bank - ASM Selection

 Question Bank

 Question Bank - SM   Exam  Dt 05-05-2015

 

Question Bank - SM LDCE Exam Dt 06-05-2015

 

Question Bank - SM LDCE  Exam  Dt 06-05-2015 -2

                  GENERAL AND SUBSIDIARY RULES

 

1. State briefly the different types of signals.

2. What are the conditions for taking off

i) Home signal ii) Starter / Advanced starter iii) IBS Signal iv) Calling-on signal.

 

3. What is the procedure to be followed in case of :-

i) Failure of reception signalii) Failure of depature signal

iii) Failure of IBS signaliv) Protection of obstruction on double line section. 

4. What is the procedure to be followed for running of trains during Total interruption of communication on single line section ?

 

5. What is the procedure to be followed for running of trains during Total interruption of communication on double line section ? 

 

6. What is the procedure to be followed for running of trains on a double line section, when one line is obstructed, when communication is available ?

 

7. Explain the procedure for performing shunting at a station on single linesection and double line section in the following circumstances

a) Single line:

i) Within station section ii) Outside last stop signal, upto opposite first stop signal

iii) Outside opposite first stop signal iv)Non-signalled shunt movement.

b) Double line:

i) Within station section ii) Block forward movement

iii) Block back movement iv) Behind a train travelling away 

 

8. What is the procedure to be followed in case of disconnection and re-connection of points?What is the procedure to be followed for dealing trains during disconnection of points?

 

9. What are the Essentials of Absolute Block System ? What are the conditions for granting line clear at a class B station on single line and double line section? 

 

10. Draw a neat diagram of a class B station, on a double line section, provided with MACLS, with common loop facility and demarcate the station section and block section.

 

11. Draw a neat diagram of a class B station, on a single line section, provided with MACLS, with simultaneous reception facility and demarcate station section and block section.  

 

12. Write the Essentials of Automatic Block System on single line and double line sections.

 

13. What are the precautions to be observed for securing of vehicles:

i) At a station ii) In the block sectioniii) Additional precautions in case of steep gradients. 

14. State the instructions for the working of Tower Wagon.

 

15. Describe the procedure for working of trains at a station, provided with

intermediate Block Stop signal: i) During the normal course ii) when it is defective. 

 

16. What are the usual circumstances for line patrolling ? State Briefly the various types of line patrolling.

 

17. State Briefly the revised Standard format of Station Working Rulesthe Chapters and the Appendices. 

 

18. i) What is the procedure to be followed, while working a goods train without Brakevan ?

ii) What are the instructions to be followed, while working a goods train without Guard ? 

 

19 What is the importance of exchanging allright signal ? What are the occasions for exchange of allright signal? Describe them in detail.

 

20. Write short notes on the following:

i) Permit to work.

ii) Neutral section.

iii) Emergency Telephone Socket.

iv) Forms used only on Electrified sections 

 

21. State briefly the types of caution orders and the circumstances under whichcaution orders are issued ? Describe the procedure for imposition, preparation issue and cancellation of caution orders..

 

22. What is interlocking ? State the various standards of interlocking, with minimum equipment of signals and the speeds permitted. 

 

23. Write short notes on the following:

i) Route cancellation

ii) Calling-on cancellation.

iii)Track- circuit / Axle counter failures.

iv) Re-setting of axle counter.

 

24. Describe the procedure in detail in case of-

i) Train partingii) Divided train workingiii) Engine pushingiv) Fire on train  

 

25.i) What are the safety equipments to be maintained at an interlocked L.C gate ?

ii) Write the procedure for working of interlocked and non-interlocked L.C gates during failure of gate stop signal

iii) Unusual occurrences at L.C gate

 

26. Write short notes on latest amendment slip to:

i) G&SRii) Block Working Manuals iii) Accident Manual 

 

27. Define the following:

i) Station Sectionvi) Facing and trailing points.

ii) Block Forwardvii) Isolation

iii) Block Backviii) Obstruction

iv) Interlockingix) Track circuit

v) Intermediate Block Signalling x) Block sectionxi) Running line

 

28. Describe the responsibilities of the Loco Pilot and the Guard while working a trainduring the run. 

 

29. Write short notes on the following:

i) Automatic Danger level indicatorii) Marshalling of dead engines

iii) Caution Orderiv) Automatic Air Brake System.v) Isolator

 

30. Write short notes on the following:

i) Classifications of stations . ii) Minimum equipment of signals at class B and class Cstations

iii) Hand Signalsiv) Point failure. 

 

31. Explain the procedure for Line Block and power block.

 

32. What are the precautions to be followed during non-interlocked working ? Explain. 

 

33. Write short notes on the following:

i) Engineering indicatorsii) Rules for Loco Pilot and Guard to pass an Automatic stop signal at ON iii) Lurch and rail fractureiv) Block Ticket

 

34. What is the procedure for running of trains during prolonged failure of all Stop

signals ?  

 

35. What is the procedure to be followed, during divided train working ?

 

36.Describe the procedure for protection of obstruction, under various circumstances. 

 

37. Write short notes on the following:

i) Reception of a train on to an obstructed lineii) Engine whistle codes and EMU Bell codes

iii) Combined Train Reportiv) Protection of work spot

 

38. State the procedure for working of material train 

 

39. Write short notes on the following:

i) Motor Trolly workingii) Lorry working iii) Marshalling of saloonsiv) Personal equipments for Loco Pilots and Guardsv) Any ten operating forms.

 

40. What is the procedure for working of trains under the Automatic Block System, during obstruction of one or more lines, when signals are operative and communications are available ?

 

41. State the advantages of Air Brake System. What are the duties of a Loco Pilot and

Guard while working a Goods Trains with Air Brake System ? 

 

42. What are the rules to be followed in the following cases:-

i) Train partingii) Security patrolling

iii) Monsoon patrollingiv) Marshalling of passenger carrying trains

 

43. Write short notes on the following:

i) Operating formsii) Air Brake System

iii) Block proving Axle counter (BPAC)iv) Reception of a train on to a non-signalled line

44. State briefly the operation of points and signals by electrical means. 

45. Explain the significance of track-circuiting of running lines as a means for detecting obstruction and the action to be taken in case of track-circuit failure, for the safe passage of trains.

 

46. Write short notes on the following:

i) Data-loggers at stations.

ii) Categarisation of level crossing gates based on TVUs, as per Boards guidlines

iii) Anti-collision device

iv) Fibre optic communication.                

 

 

  

Join

RAIL NEWS CENTER

Community

 

For Rail employee Information, railway News, Manual, Circular, News, Rules, Departmental Question Bank,  Mutual Transfer etc.

Click Here