Logo

 

  Type Your Question In The Box Below ↓

 

Entertainment

Health

Home Remedies

News Papers 

  

General Knowledge

Our Youtube

Railway Employee

Railway

Mutual  Transfer

Railway

Question Bank

Railway

Departmental Exam 

Rail Employee 

YouTube  

Railway News 

Railway

Rules & Books

Railway

Circulars & Order

Retirment

& Pension

Railway

Manuals & Codes 

Railway

Study Material

Railway

Telephone Directory

 

 

 

 SYLLABUS - GROUP ‘B’ POST OF ADME/AME/AWM 70 % QUOTA IN MECHANICAL DEPARTMENT

 

 

 For All LDCE Exam
 Official Language

- Official Language Policy,

- Act, Rules,

- Incentive Schemes etc.

 Syllabus - Establishment Syllabus - Financial Rules

 

Paper will be of two parts

- One part comprising of questions from establishment, Financial Rules and Stores which will be mandatory for all.

- Other part will be of Technical questions from four streams of Mechanical Department. Questions on PU are included in workshop segment.

- Question on Rajbhasha will be of optional nature of fifteen marks

Official Language

- Official Language Policy,

- Act, Rules,

- Incentive Schemes etc.

Part-A 

Consists of questions from Establishment, Financial rules & Stores.

 

Part-B

Contains Professional portion in Four sections representing various streams of Mechanical Branch

– Divisional working and Disaster management,

- Diesel Locomotives,

- Carriage & Wagon,

- Workshops and PU,

PART-A

1. Syllabus - Establishment

 

2. Syllabus - Financial Rules

 

3. STORES

 

 - Classification of Stores

 - Procedure of drawl of Stores

 - Indenting Procedures

  Procurement methods

 -Local purchase,

 - Spot purchase,

 - Bulletin tender,

 - Advertised tender,

 - Limited tender,

 - Tender Committee,

 - Direct Purchasing

 - Schedule of Powers

 - Incoming inspection requirements

 - Scrap disposal

 

 

PART-B- Professional Portion

DIVISIONAL WORKING & OPERATIONS MANAGEMENT

 

Working Time Table

   

 - Working in Control Office including Passanger grievance redressal portals e.g. Rail Madad

 - Accident Classification, definitions,

 - ART Ordering,

 - Role of Supervisors & officers at accident site Management.,

 - Accident investigation including proforma for measurement

- 140 ton Crane Construction & safety in operations

 

DIESEL LOCOMOTIVES

 

  • Basic Features and troubleshooting of HHP locomotives
  • Preventive maintenance schedules
  • Latest design improvements in diesel locomotives to reduce failures on line.
  • Features of GE Locomotives
  • Design improvements in bogies to make them fit for high speed operation
  • Air Brake system of diesel locos including working of compressors and vigilance control devices and their maintenance
  • Cooling water system of diesel engines
  • Fuel oil system of diesel engines
  • Control of lubricating oil consumption
  • Safety devices used on diesel engines and locomotives
  • Trouble shooting on locomotives running on the railways
  • Fuel Economy on diesel locomotives
  • Thermal loading of engine components
  • Under gear maintenance
  • Suspension bearings, wheels
  • Electric Systems of Diesel Locomotive
  • Load Box Testing
  • MEMU, DEMUs-types, systems & trouble shooting
  • Basics of DPRS (Distributed Power Rolling Stock)
  • Introduction to GM Locomotives and its systems

 

CARRIAGE & WAGON

 

Coaching stock

- Preventive maintenance schedules in Coaching Depots including IOH.POH, SS2, SS3 Schedules in shops

 

Wagon Stock-

 - Preventive maintenance including ROH in depots and POH Schedule in shops ,

 - Ride Index, Anti Telescopic features

 

  • IRCA Rules for rejectable defects
  • ICF & LHB Coach Bodies and their maintenance in sick line/shops
  • Generic details of train set
  • Casnub Bogie & its modifications for high speed
  • Corrosion repairs to caching and goods stock
  • Couplers & Draw gear, Train Parting, Brake Binding & measures to avoid the same
  • Water availability in coaches
  • Fire prevention on Trains
  • Air Brake System-Twin Pipe & single pine. Under frame & bogie mounted brake system, Test rig, Checking timings, trouble shooting, DV defects, slack adjustment methods. Brake Binding, WSP system, FIBA, Air spring suspension in LHB coaches
  • Passenger amenity items
  • OBHS , CTS and other coach cleaning systems
  • Maintenance Pattern of freight trains including CC Rakes & Coaching stock maintenance including Revised Policy Circular-4
  • Neutral Train Examination
  • Maintenance of various components like DV, SAB, PEASD
  • Latest design improvements of Carriage & Wagons to improve their performance and speed potential
  • LHB Coaches & BLC Wagons
  • Construction, Design & Maintenance of special purpose Wagons

 

Workshops and Production Units

 

  - System of labour accountal GA Cards for time keeping documents,

  - tally sheets, Job/Route Cards, inspection & rate fixing

  • Rules & Calculations under incentive scheme
  • Paints & painting systems
  • Different types of machine tools such as lathes, milling machines, shapers, planers, cutting tools & cutting speeds
  • CNC machines
  • CLW Pattern of Incentive Scheme, Group Incentive Scheme
  • Different types of welding processes, welding defects
  • Wheels, tyres & axles and their ultrasonic testing
  • Heat treatment of ferrous items such as surface hardening, annealing, normalizing etc
  • Roller Bearing & Cartridge Bearings
  • Injury free features in coaches
  • Material handling
  • Design of coaches and wagons
  • Basic concepts of casting and Heat treatment methods
  • Manufacturing and Heat treatment process of wheels and axles
  • Factory Layout
  • Process flow chart of Production Units
  • Machinery and Plant maintenance



 ALSO SEE